SafetyinconstructionshowCall (352) 893-4112

Perc Test and Site Evaluation

Perc Test and Site Evaluation in Ocala

No septic design gets permitted in Marion County without a soil report behind it. Safetyinconstructionshow performs the soil percolation test and site evaluation that the health department requires, measuring how fast the ground drains and where the seasonal high water table sits before a single trench is planned.

Why the Test Comes First

The perc rate sets the drainfield size, and the water table sets the system type. When there is four feet of vertical separation to the seasonal high water table, a lot near Silver Springs Boulevard can usually take a conventional gravity system. When there is not, the same soil report is what proves you need an engineered mound or an aerobic treatment unit instead. Guessing at this step is how a build fails inspection and the money is spent twice.

Our Process

We dig the test holes, log the soil profile, and record the water table, then package the results into the site evaluation the county reviews. If you are buying acreage near Anthony or Citra, this same report tells you what kind of system a parcel can support before you close. You get the numbers in writing, and we can carry them straight into a permitted install.

Call (352) 893-4112 to schedule a perc test and site evaluation in Ocala.

Need help in Ocala?

Call (352) 893-4112